Development of an optimum wind farm layout using four met masts

Site: Western Canada Results: The influence of the nearby sea is strongly overestimated by the model, this could be solved through a modified modelling of the roughness lengths. Poor quality of the met mast data, inconsistent anemometer data Due to the measurement heights being close together, no reliable vertical extrapolation is possible. A first layout

Wind park optimisation of 40 planned wind turbines

Site: Bosnia-Herzegovina Results: due to a pronounced main wind direction the planning of the wind turbines was modified to one single row instead of two with short distances between the turbines better placing on a mountain ridge possible