Wind park optimisation of 40 planned wind turbines
Wind park optimisation of 40 planned wind turbines
Site: Bosnia-Herzegovina
Results:
due to a pronounced main wind direction the planning of the wind turbines was modified to one single row instead of two with short distances between the turbines
In 2019, a wind measurement with a Sodar was completed successfully in the high mountains of Bosnia under winterly conditions. In 2019, a wind measurement with a Sodar was completed successfully in the high mountains of Bosnia under winterly conditions. In 2019, a wind measurement with a Sodar was completed successfully in the high mountains